We just got our electrical rough-in inspection done. Up until that, even though we were spending every weekend working on the camp, there just wasn't too much to show for it.
So this time, we finally have some progress. First, the outside rock facing is done (except for putting on the lights).
 |
| Finally!!! |
And, we are finally starting to work on the kitchen. Drywall has been delivered, and we got the two exterior walls insulated:
 |
| Before: the kitchen sink area |
 |
| Before: main kitchen wall |
 |
| During: kitchen sink area |
 |
| During: main kitchen wall |
Stay tuned for next week, when we hope to have kitchen walls up and starting to put in base cabinets! (Yes, there is supposed to be an insulation inspection, but our local building inspector was OK with us insulating and covering the kitchen walls and just sending him pictures).
Here's one more shot of the exterior, with the new stone facing:
 |
| Now, of course, I need to clean and touch up the trim and put on the lights... |